• Our Work Gallery

Static Pile Load Test

Dynamic load test on Bored Pile.

Determination of pile length under existing structure

Pile integrity test

Strain gauges fixed to rebar.

Connect rebar to steel cage of bored pile .

Pile after instrumentation.

Connect all cable to switching box.

Load cell placement on hydraulic jacks.

Load cell placement on hydraulic jacks.

Sonic logging(Coring) preparation

Sonic logging monitoring

Sonic logging recording

Inclinometer monitoring .

Measurement of pile lateral movement by inclinometer during lateral load test.

Drill hole monitoring.

Drill hole monitoring recording .

Electric dutch cone penetration.

Electric dutch cone penetration.

Soil boring by rotary machine.

Concrete compression test .

Concrete compression test.

Survey work

Survey work

Secant pile wall monitoring

Diaphragm wall monitoring

Laboratory soil test.

Laboratory soil test.

Field soil density test.

Field soil density test.

Our Partner

news_img
news_img
news_img

News

Wind Power Project.

In October 2015, Infratech ASTM Co., Ltd has awarded the contract for tubular tower design and space frame tower design of Krissana Wind Power Project, K.R. One Project, K.R.S. Three Project and Tropical Wind Project.


Kabinburi Power Plant

On 15-Oct-15 The TOYO Engineering company hire the contract of Soil / Rock investigation and soil laboratory test for the KABINBURI Power Plant project


Soil Investigation and Pile load test.

On 21-May-15 The Juwi company hire the contract for Soil investigation and Pile load test 3 projects as follows B-GRIMM 8 MW Shine Solar Farm , B-GRIMM 8 MW Yanhee Solar Farm and B-GRIMM 6.5 MW Yanhee Solar Farm Wang Muang District,Saraburi Province.


Link