• Inclinometer System
    • Inclinometer system for detection of lateral movement of earth structure and land slide.
    • Settlement monitoring system of building and embankment.
    • Piezometer and stand pipe system for monitoring pore water pressure of the soil.
    • Extensometer system for monitoring of tunnel convergence.
    • Monitoring well system for monitoring of ground water level and quality.

              INCLINOMETER SYSTEM : Lateral movements within landslide, diaphragm wall and foundations can be measured precisely and economicaly by Inclinometer system. Our company provide you services in both installation and monitoring.

soilInvestagation

Monitoring in Embankment
(Nitchada Thani : Bangkok)

soilInvestagation

Moniroting in diaphragm wall
(Jewelry Trade Center)

soilInvestagation soilInvestagation
soilInvestagation

Our Partner

news_img
news_img
news_img

News

Wind Power Project.

In October 2015, Infratech ASTM Co., Ltd has awarded the contract for tubular tower design and space frame tower design of Krissana Wind Power Project, K.R. One Project, K.R.S. Three Project and Tropical Wind Project.


Kabinburi Power Plant

On 15-Oct-15 The TOYO Engineering company hire the contract of Soil / Rock investigation and soil laboratory test for the KABINBURI Power Plant project


Soil Investigation and Pile load test.

On 21-May-15 The Juwi company hire the contract for Soil investigation and Pile load test 3 projects as follows B-GRIMM 8 MW Shine Solar Farm , B-GRIMM 8 MW Yanhee Solar Farm and B-GRIMM 6.5 MW Yanhee Solar Farm Wang Muang District,Saraburi Province.


Link