• Pile integrity test(PIT)
    • Pulse and vibration test
    • Seismic test
    • Sonic logging test
  •       During pile construction, driven piles may be damaged by High Stress Impact, bored piles may suffer from separation of concrete, necking, inclusion, void etc.

         After construction, bored piles may be damaged by lateral earth pressure from excavation, construction plants or slope failures.Those kinds of damage can be detected quickly by pile integrity tester. We provide service with the most up date pile integrity tester from Pile Dynamic Inc(PDI) and Test Consult.

soilInvestagation

Seismic Test (PIT)

soilInvestagation

Seismic Test (PIT)

Sonic logging can check integrity of large concrete bored pile
to ensure quality of the whole pile lenght.

soilInvestagation

Sonic Logging System

Our Partner

news_img
news_img
news_img

News

Wind Power Project.

In October 2015, Infratech ASTM Co., Ltd has awarded the contract for tubular tower design and space frame tower design of Krissana Wind Power Project, K.R. One Project, K.R.S. Three Project and Tropical Wind Project.


Kabinburi Power Plant

On 15-Oct-15 The TOYO Engineering company hire the contract of Soil / Rock investigation and soil laboratory test for the KABINBURI Power Plant project


Soil Investigation and Pile load test.

On 21-May-15 The Juwi company hire the contract for Soil investigation and Pile load test 3 projects as follows B-GRIMM 8 MW Shine Solar Farm , B-GRIMM 8 MW Yanhee Solar Farm and B-GRIMM 6.5 MW Yanhee Solar Farm Wang Muang District,Saraburi Province.


Link