• Static pile load test
  •       To ensure loading performance of pile, load testing of piles are require . We are capable to conduct load test up to 3,000 tons by Anchorage System or by Kentledge System up to 300 tons.

soilInvestagation

Load test at Top View Tower 2,500 Tons : Anchorage system.

soilInvestagation

Load test at Inburi Interchange 300 Tons:Kentledge system .

  • DYAMIC PILE LOAD TEST
  •        On both driven and bored pile up to dia.2.00 m can be tested.

soilInvestagation

Dynamic load Test on bored pile dia. 2.00 m. :Hope well project

soilInvestagation


soilInvestagation

Dynamic load Test at Ramathibodi toward Leadig Medical School in Asia Project.

Our Partner

news_img
news_img
news_img

News

Wind Power Project.

In October 2015, Infratech ASTM Co., Ltd has awarded the contract for tubular tower design and space frame tower design of Krissana Wind Power Project, K.R. One Project, K.R.S. Three Project and Tropical Wind Project.


Kabinburi Power Plant

On 15-Oct-15 The TOYO Engineering company hire the contract of Soil / Rock investigation and soil laboratory test for the KABINBURI Power Plant project


Soil Investigation and Pile load test.

On 21-May-15 The Juwi company hire the contract for Soil investigation and Pile load test 3 projects as follows B-GRIMM 8 MW Shine Solar Farm , B-GRIMM 8 MW Yanhee Solar Farm and B-GRIMM 6.5 MW Yanhee Solar Farm Wang Muang District,Saraburi Province.